Skip Main Links
Small creek surrounded by wooded area beside the windowed hallway
press

Bringing Staff and Student Voices into the School Design Process

From K-12 Dive, learn how DLR Group’s approach to integrated design is spurred through feedback from students and staff. James. L. Capps Middle School creates adaptive and flexible learning spaces because of this process.

Learn more about the collaborative planning process from K-12 Dive.

Press

In The Media

Contact Us

Contact Us

  • This field is for validation purposes and should be left unchanged.