Terminal 1 Block A and C Buildings Open at the Port of Vancouver
September 23, 2024New waterfront mixed-use development signals revitalization and elevates working and living along the shores of the Columbia River.
Terminal 1 Port Vancouver OpensClient
Port of Vancouver USA
Project Location
Vancouver, WA
Area
287,000 SF two office buildings; 347,000 SF parking
Services
Architecture, planning, and acoustical design
Once home to shipbuilding dry docks, Terminal 1 is transforming into an active community destination. Blocks A & C add two modern office towers linked by The Launch, a public promenade reconnecting the waterfront to its history. Alongside the AC Hotel and future phases of housing and markets, the development is revitalizing the neighborhood with a lively, pedestrian-focused riverfront.
The Latest
Terminal 1 Block A and C Buildings Open at the Port of Vancouver
September 23, 2024New waterfront mixed-use development signals revitalization and elevates working and living along the shores of the Columbia River.
Terminal 1 Port Vancouver OpensAwards
2025 DCJ Oregon Top Projects Award
2025 Top Projects
2025 Night of Excellence in CRE
Commercial Association of Brokers